Public Transportation studies
Project Detail
The first stage in the formulation of a transportation plan is to collect data on all factors that are likely to influence travel pattern. The work involves a number of surveys so as to have an inventory of existing travel pattern, an inventory of existing transportation facilities and an inventory of existing land use and economic activities. The client intended m/s Sheher Saaz to provide detailed transportation studies, transport modelling and feasibility studies for integrated bus operation in Lahore.
The scope of services was to carry out Household interview survey's and studies. The number of house hold samples are 12,000 and survey zones as per map attached were 5. Detailed survey of the required area was carried out to provide base for transportation modelling and feasibility studies for the integrated bus operation in Lahore.